THE ANNIN ROBOTICS FORUM HAS MOVED TO A NEW COMMUNITY. 👉
Pierre-Alexandre Girard
Pierre-Alexandre Girard
@pierre-alexandre-girard
Trusted Member
Joined: Jul 8, 2025
Last seen: Aug 19, 2025
Topics: 6 / Replies: 57
Reply
RE: AR3 in Florida

I wasn't sure I could machine the J4 timing hub but I gave it a shot anyway. The timing belt does engage but seems to slip because the teeth are too s...

2 months ago
Forum
Reply
RE: AR3 in Florida

And finally a lot of assembly to get to this stage where the ARM, J2 and J3 are pretty much done

2 months ago
Forum
Reply
RE: AR3 in Florida

Today J5 housing - pretty intensive machining (7 operations total) but result looks all right

2 months ago
Forum
Reply
RE: AR3 in Florida

And now 2 parts for J5: the belt carrier and the tension block Only 6 parts left to machine !

2 months ago
Forum
Reply
RE: AR3 in Florida

And one more part (J6 Main bearing arm) and a bit of assembly for tonight With this done I'm left with 3 parts to machine and about 86% completio...

2 months ago
Forum
Reply
RE: AR3 in Florida

And here are 2 more parts : J6 housing - I machined it on the CNC exclusively (6 ops) and no lathe - a bit unconventional but it sort of worked...

2 months ago
Forum
Reply
RE: AR3 in Florida

Just for fun - here are the parts that didn't made the cut.... From left right: check the orientation of your part when you flip it for OP2...

2 months ago
Forum
Reply
RE: AR3 in Florida

This WE I was able to work on the assembly with all mechanical joints completed Soldering of motors is also completed, along with limit switches...

2 months ago
Forum
Reply
RE: AR3 in Florida

And with the final wire soldered this is the time to close the box... With this (and the missing gripper) the arm portion is now complete - I was...

2 months ago
Forum
Reply
RE: AR3 in Florida

Today I received the gripper so I proceeded the mill the LAST part of the build: the gripper holder

2 months ago
Forum
Reply
RE: AR3 in Florida

Before After Now I just need to teach AR3 how to clean ... :)

2 months ago
Forum
Reply
RE: AR3 in Florida

I was able to complete the wiring, the programing and the first tests, there are good and bad news: J1 skips, I have about +/- 10 degrees of...

2 months ago
Forum
Reply
RE: AR3 in Florida

Hi, In order to machine these parts all you need are the STEP files that Chris is selling on this site. I converted these files to Fusion 360 an...

2 months ago
Forum
Topic
2 months ago
Forum
Replies: 39
Views: 317
Reply
RE: AR2 from Italy

Great build - thanks for sharing, I too am building the robot in aluminum and my setups and fixture are very different - I learned a lot from your exp...

2 months ago
Forum
Page 4 / 5
Upload your Photo